Cloud Assessment AutomationAssessments / Current vs future
Build tools
INTERNAL WORKBENCH · NOT A CLIENT DELIVERABLE

What the engine does today, and what each screen shows

Four separate questions, never one label: does the engine have the capability, where is this assessment, is there a workbench screen yet, and what is planned later. A database that predates a layer is a fact about that assessment, not about the product.

North Star pageEngine capability Workbench screenNYC Campaign Finance Board
CFB (real, read-only)
Real · read-only
1. Executive SummaryIn the engine
D1 governed assessment package
Screen availableCan't be read yet
There is no assessment database for it on this computer.
2. Technology EstateIn the engine
Whole-estate Phases 1 to 3
Screen availableCan't be read yet
There is no assessment database for it on this computer.
3. FindingsIn the engine
Phase 4 coverage, conditions and findings (C1, P2a), Claims (C2)
Screen availableCan't be read yet
There is no assessment database for it on this computer.
4. RecommendationsIn the engine
V1.2 decision problems, V1.3 candidate reasoning, P1 records and register, P2b surfacing
Screen availableCan't be read yet
There is no assessment database for it on this computer.
5. Future-State ArchitectureIn the engine
P3 target state
Screen availableCan't be read yet
There is no assessment database for it on this computer.
6. RoadmapIn the engine
P4 workstreams, waves, gates and risks
Screen availableCan't be read yet
There is no assessment database for it on this computer.
7. Cost & OptimizationPlanned after the POC
Money model: outside the POC
Screen availableCan't be read yet
There is no assessment database for it on this computer.
8. Evidence & GapsIn the engine
Whole-estate Phase 4 and D1
Screen availableCan't be read yet
There is no assessment database for it on this computer.
9. Audit / Why?In the engine
D1 trace, plus the estate trace commands
Screen availableCan't be read yet
There is no assessment database for it on this computer.
10. Client DeliverableIn the engine
D1-1 package and D1-2 release gate, Block 2 rendering
Screen availableCan't be read yet
There is no assessment database for it on this computer.

In the engine today

  • Estate and sources · Whole-estate Phases 1 and 2
  • Connections · Whole-estate Phase 3
  • Capability coverage and assessment areas · Whole-estate Phase 4
  • Capability facts · Whole-estate Phase 4
  • Approved scope · Whole-estate populations
  • Flag review and findings · Conditions and findings (C1, P2a)
  • Statements for client use · Claims (C2)
  • Decision problems, records and register · V1.2 and P1
  • Target state · P3
  • Plan and roadmap · P4
  • Governed assessment package · D1-1
  • Release gate · D1-2

Planned later

  • Automatic source classification
    Planned after the POC (N9).
  • Money model: cost, savings, licensing
    Planned after the POC. The engine says "not assessed".
  • Readiness scoring
    Deferred (N8). Never reconstructed from older deliverables.
  • Wave exit criteria as records
    Deferred (N7).
  • Calendar dates and effort
    Out by design. Waves are relative.
  • Provider-specific target services
    A later layer. The target is provider-neutral.
  • Executive narrative
    Not in the engine. Client text comes from templates or human narrative only.

Turn on Build status overlay in the top bar to see these tags on every page. What the labels mean →